• KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00225
  • TJS/USD = 0.10850
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
18 November 2026

Viewing results 1 - 6 of 1

Central Asian Universities Launch EU-Backed Network for Renewable Energy Research

The Central Asia-EU Research Network for Renewable Energy launched in Astana on November 17. One of its first priorities is to study how to connect new solar and wind farms to the grid while keeping the region’s power systems reliable. The network is part of the EU4SustainableCentralAsia: Renewable Energy in Central Asia (EURECA) project. Kazakhstan’s Nazarbayev University and Austria’s Centre for Social Innovation signed the agreement with EURECA. The other signatories were Tajik Technical University named after Academician M.S. Osimi and Tashkent State Technical University named after Islam Karimov. Germany’s development agency, Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), runs EURECA in all five Central Asian countries on behalf of the Federal Ministry for Economic Cooperation and Development. The European Union (EU) co-funds the project under its Global Gateway strategy. The network will help member universities conduct joint research with European partners and apply for international funding. At a workshop in Porto ahead of the launch, participants discussed joint applications to Horizon Europe, the EU’s research and innovation program. In early 2027, the network will draw up a detailed work plan setting out joint activities and priorities. It expects universities in Kyrgyzstan and Turkmenistan to sign agreements soon, with further expansion planned throughout the year. In December 2025, Kyrgyzstan opened its first large-scale solar power plant, a 100-megawatt (MW) facility in the Kemin district. Tajikistan held an opening ceremony for the Asht solar plant on September 21, 2026. It has a design capacity of 250 MW, and another plant of the same size is under construction in the Jayhun district. As of August 2026, Kazakhstan had more than 3.8 gigawatts (GW) of renewable power capacity in operation, including hydroelectric and biogas plants. In November, the energy minister said the country planned to add at least 8.4 GW of renewable capacity by the end of 2035. By May 2026, Uzbekistan had 20 large solar and wind power plants in operation, with a combined capacity of about 5.6 GW. The country had also brought 12 energy storage systems online, with a combined power rating of about 1.5 GW. Researchers from GIZ and the regional power dispatch center in Tashkent presented a grid study at the Porto workshop. They modeled power systems in Kazakhstan and Uzbekistan for 2028–2032. At the upper end of their projections, wind and solar generation could exceed electricity demand for 1,300 to 1,400 hours a year. During those hours, operators could store surplus power or export it to neighboring grids. If storage and transmission capacity fell short, they would have to limit the plants’ output. In Uzbekistan, the 1.5 GW Kungrad wind farm now under construction includes a 300 MW battery storage system. Connecting the wind farm to the grid will require about 930 miles (1,500 kilometers) of high-voltage transmission lines. The plans also call for three new substations and upgrades to two others.