• KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850
  • KZT/USD = 0.00210
  • TJS/USD = 0.10800
  • UZS/USD = 0.00008
  • TMT/USD = 0.29850

Viewing results 1 - 6 of 3

Interview: How Kazakhstan Plans to Finance Its Next Railway Expansion

Kazakhstan is preparing for the next phase of its railway expansion. Alongside the major lines already under construction, the authorities are considering new routes and upgrades to existing sections intended to increase network capacity, serve industrial producers, and accommodate growing transit volumes. Implementing those plans will require substantial investment. Some projects may be financed by the state, while others are expected to rely on private capital, international financial institutions, and public-private partnerships. Kazakhstan’s Vice Minister of Transport, Zhanibek Taizhanov, spoke to The Times of Central Asia about construction deadlines, proposed new routes, and whether the country’s railway priorities are beginning to shift. TCA: Kazakhstan is building several major railway projects at the same time. When are the main lines expected to be completed? Zhanibek Taizhanov: The Moyynty-Kyzylzhar and Darbaza-Maktaaral railway lines are scheduled to enter operation by the end of this year. Construction of the Bakhty-Ayagoz line is expected to be completed by the end of 2027. In addition, trial train operations began on the Almaty bypass line in December last year. The authorities previously instructed the Transport Ministry and Kazakhstan Temir Zholy to launch the Moyynty-Kyzylzhar and Darbaza-Maktaaral lines by the end of 2026 and commission Bakhty-Ayagoz by the end of 2027. TCA: The government has called for preparations for the next stage of railway development. Which projects is the ministry considering, and what needs are they intended to address? Zhanibek Taizhanov: The Ministry of Transport, together with Kazakhstan Temir Zholy and the relevant government agencies, has been tasked with examining the next phase of railway infrastructure development, taking into account projected growth in freight flows, transit traffic, and the economy’s long-term needs. The projects under consideration include the construction of second tracks on the Arys-Kazaly section. The project is intended to increase the capacity and carrying capability of one of the key sections of the railway network, support sustained freight growth, and improve transport services for the country’s southern and western regions; construction of the Inderbor-Uralsk railway to improve regional connectivity, make freight transportation more efficient, and create additional opportunities for the industrial and logistics development of western Kazakhstan; modernization of the Kyzylzhar-Shubarkol-Yesil section, which would increase the capacity of a route used to transport coal and mining products and improve logistics for industrial enterprises; modernization of the Inderbor-Makat railway section to improve the transportation of oil, gas, and industrial cargo and develop transport infrastructure in the western regions; and development of railway infrastructure in the Karagaily industrial zone in the Karaganda Region to serve existing and planned production facilities, attract investment, and support the region’s industrial development. These projects are being examined because the railway network needs to develop in step with growing domestic, export, and transit freight volumes. Their implementation would increase infrastructure capacity, meet the needs of industry and logistics, and create additional conditions for the socioeconomic development of the regions. TCA: Existing projects largely expand transit and export routes, while many of the proposed lines are linked to industrial enterprises. Does this signal a...

Turkmenistan Launches Railroad Route Between Iran and China via Kazakhstan

Turkmenistan has launched a test container train on the China-Kazakhstan-Turkmenistan-Iran route. The project, which provides a fast transportation corridor between East and West, is the result of negotiations between representatives of the railway departments of China, Kazakhstan, Turkmenistan, and Iran. Thanks to the new route, cargo delivery between China and Iran will be reduced to 15 days. The parties have agreed on a full schedule of container trains and preferential tariff rates, and set up an expert group to develop a fixed schedule. During the test run, a train with 45 forty-foot containers loaded with auto parts departed from Xi'an, China, and traveled the route Xi'an, China - Altynkol, Kazakhstan - Bolashak, Kazakhstan - Etrek, Turkmenistan - Tehran, Iran. In the opposite direction, a train with 50 containers of gypsum powder traveled on the route Kum (Iran)—Etrek (Turkmenistan)—Bolashak (Kazakhstan)—Altynkol (Kazakhstan)—Yiwu (China). Containers are reloaded from broad gauge to narrow gauge and back again at the Etrek railway terminal, allowing efficient cargo transportation between countries with different railway gauges.

Iran-Turkmenistan-Kazakhstan-China Rail Transport Route Resumes Operation

KTZ Express, a subsidiary of Kazakhstan’s national railways company Kazakhstan Temir Zholy (KTZ), and China Railway Container Transport Co. Ltd. have resumed the operation of  container trains on the Iran-Turkmenistan-Kazakhstan-China route. As reported by KTZ’s press service, representatives of Iran, China, Kazakhstan, and Turkmenistan attended a ceremony on July 21 at Iran's Aprin station to mark the departure of a container train to China. The train, consisting of 50 forty-foot containers, will arrive in China within 12 days. This shipment marks the restoration of the transport corridor, strengthening trade relations between participating countries.