Kazakhstan’s Ministry of Transport has initiated dredging works at the Caspian Sea port of Aktau, aiming to enhance the capacity and navigational safety of a critical hub on the Trans-Caspian International Transport Route (TITR), also known as the Middle Corridor.
The Aktau port, located in the Mangistau region, is being deepened by 1.5 to 2 meters using specialized dredging equipment supplied by European contractor Jan De Nul. Mobilization of the equipment is set to be completed in May, with full dredging operations scheduled for completion by the fourth quarter of 2025.
The project is expected to significantly increase the port’s terminal capacity. Currently, Aktau handles approximately 15 million tons of cargo annually, including up to 140,000 twenty-foot equivalent units (TEUs).
This infrastructure enhancement forms part of Kazakhstan’s broader strategy to develop the TITR, a key transit corridor linking China to Europe through Central Asia and the Caucasus. According to the Ministry of Transport, container traffic via the TITR through Kazakhstan surged by 3.5 times in the first quarter of 2025, reaching 25,000 TEUs, up from 7,200 TEUs during the same period in 2024.
In a related development, Kazakhstan completed dredging works at another major Caspian port, Kuryk, in November 2024. That project, also executed by Jan De Nul Kazakhstan LLP, was finished in just four months. The water depth at Kuryk was increased to 7-8 meters, substantially enhancing its handling capacity and reinforcing its strategic importance on the Trans-Caspian route.